ASSIGNMENT 1




Open the fact guide above for essential information.



MY ANSWERS

1 What sort of building would the Art Gallery be classified as?
  



2 Calculate the area of ground covered by the building.    m2

3 If you walked around the sides of the building, how far would
you travel?


   m

Because of its height the Art Gallery needs strong FOUNDATIONS which go down below ground level. The foundations go down 3 metres. So the first stage in building was to EXCAVATE a hole 35m long, 30m wide and 3m deep. Once the earth has been excavated and taken away the concrete can be poured in.

4 Calculate the volume of earth that was removed for the Art
Gallery's foundations.


   m3

5 In one day 150m3 can be excavated. If there were no delays
how long did it take to excavate the foundations?


   days

6 One lorry can take away 10m3 in each load. How many lorry
loads would be taken away each day?


  

7 Each lorry can make 5 trips per day. How many lorries
would be needed to keep up with the excavation?


  

8 One lorry load weighs 20 tonnes. What is the weight of 1
cubic metre of soil?


   tonnes

One cubic metre of concrete costs £50 and weighs 2400kg. Each mixer lorry can carry 5 cubic metres of concrete. The concrete is poured at the rate of 20 cubic metres per day.

9 What is the cost of one load of concrete?

  £

10 How much does one load of concrete weigh?

   tonnes

11 How many loads were delivered each day?

  

12 Calculate the weight of the concrete poured each day.

   tonnes

Production supported by